Ibstock Bevern Dark- Some bricks still with damaged faces

Ground floor courtyard elevation of classroom block

DPC detail- projecting 5mm either side

Pattern brickwork underway

DPC bonding issue resolved with insulation

Kingspan insulation installed

Lift shaft block underway

DPC peeling away due to cold weather

Class 1 mortar used to blockwork

Openings formed

Temporary support to Otway ground floor

Flooding continues in Otway basement

Assembly Hall slab completed

trough formed to assembly hall slab