100511 Site Visit

Assembly Hall high level brickwork reference panel- record photos of current status- now to be rebuilt.


Header not centred with course beneath


Mortar joints inconsistent


Setting out between courses outside tolerance


Header not centred with course above


Corner specials laid out of plumb and also laid incorrectly


Headers not centred with courses above

Monday, 10 May 2010

100506 Site Visit


Chimney rebuild/ scaffold to Otway. Chimney pots/ caps to be added


Terracotta transoms to be installed- details to be discussed/ confirmed.


Lambs terracotta sections


Steel strap required to arch AS.ID.01.01


Corbelling of brickwork required to meet chimney size above


Valley timber to be uncovered to reveal if any further rot present


Assembly high level reference panel complete- but comments from previous SVR still unresolved regarding alignment/ specials/ cuts. To be addressed.


Crack to slab 2nd floor G/L B 1-2


Crack- detail


Junction GL C/4


2nd floor slab after pour


Assembly hall blockwork GL N/20


Assembly Hall blockwork underway


Blockwork adjacent steelwork supporting mezzanine- awaiting intumescent paint


Blockwork/ DPC forming trench/ plenum to assembly hall


Penetrations of blockwork will now require intumescent silicon seal


Windows/ Metsec set out assembly hall


Metsec to assembly hall


Framing out of roof complete to assembly hall high level roof


Insulation/ framing out complete to some areas in assembly hall


Blockwork infill underway to assembly hall ground floor level

Friday, 30 April 2010

100429 Site Visit


Brickwork overview classroom block


Classroom block brick over CL.ED.00.03 to be cleaned up- spattered with mortar


Mortar missing to facing bricks- GL8 north elevation


Detail for TSI Steels/ link/ classroom block to be forwarded/ instructed


Setting out of 1st floor Otway low wall 1st floor to be updated- survey of stairs out


Rebar to 2nd floor slab


Ditto


Metsec added to east elevation Assembly Hall- nets added


Services penetration required to plinth roof prior to framing up- to be removed


Handrail detail over window to be clarified


Otway basement now half-filled


Otway 1st floor low partition to stair


Rot to valley beam


Preparation for padstone pour 1st floor Otway


Assembly Hall upper reference panel underway


Reference panel face


Reference panel from corner with specials


Discrepancy to course 84- on corner


Discrepancy to bonding courses 76-78 to right elevation B (AS026 rev C2)


Discrepancy between courses 74 and 76 to main elevation A (AS026 rev C2)
brickwork not aligned- special corners unnecessarily cut


Special R4 cut unnecessarily course 78 right elevation(AS026 rev C2)


Classroom overview from Ingrave Road


Assembly Hall overview from Ingrave Road