100128 Site Visit


Block/ brickwork in progress adjacent G/L 1


Classroom 1 Blockwork


Classroom 1 blockwork/ openings formed


Lintol to blockwork- Classroom 2



Openings omitted to Male and Female WC ground floor


Patterned facing brickwork upto DPC- Ingrave Road Elevation


Assembly Hall reinforcement nears completion


Otway opening to be rectified

Friday, 22 January 2010

100121 Site Visit


Classroom block reference panel with joint tests- Raked (top) Bucket handle (middle) Hose (bottom)
Proceed with bucket handle


Motif pattern in contrasting band (formerly glazed brick zone)


Hose joint (lower part)


Imperfections in the Bevern Dark


Corner w/ Dark Brown D (left) and Black D (right) coloured mortars
Proceed with Dark Brown D


Motif detail


Overview


Lightning protection samples- proceed with brown (top) and strike plate (bottom)


Reinforcement to Assembly Hall slab


Reinforcement/ slab prep prior to pour


Slab prep assembly green room/ plantroom


GSHP manifold requires adjustment to cover level for greater soil cover


Opening to Classroom block entrance CL.ED.00.01- right return brickwork with omitted movement joint. All brickwork to return will be supported from footing.


Ditto return to left hand side. Note vertical DPC.


Blockwork proceeds ground floor Classroom block


Patterned brickwork proceeds below DPC level to Classroom block courtyard elevation


Otway floors awaiting foundations for temporary support


Otway fireplaces bricked up- vent detail required.

Monday, 18 January 2010

100114 Site Visit


No blockwork progress at present


Classroom block block partitions current status


Blocks still snow covered


Contractor to ensure DPC is adequately secured and overlapped


DPC adjacent ramps


Manifold for GSHP in position


DPC/ ties to blockwork Ingrave Road Elev Classroom Block


Ensure DPC is adequately overlapped


Assembly Hall slab in progress