Friday, 22 January 2010

100121 Site Visit


Classroom block reference panel with joint tests- Raked (top) Bucket handle (middle) Hose (bottom)
Proceed with bucket handle


Motif pattern in contrasting band (formerly glazed brick zone)


Hose joint (lower part)


Imperfections in the Bevern Dark


Corner w/ Dark Brown D (left) and Black D (right) coloured mortars
Proceed with Dark Brown D


Motif detail


Overview


Lightning protection samples- proceed with brown (top) and strike plate (bottom)


Reinforcement to Assembly Hall slab


Reinforcement/ slab prep prior to pour


Slab prep assembly green room/ plantroom


GSHP manifold requires adjustment to cover level for greater soil cover


Opening to Classroom block entrance CL.ED.00.01- right return brickwork with omitted movement joint. All brickwork to return will be supported from footing.


Ditto return to left hand side. Note vertical DPC.


Blockwork proceeds ground floor Classroom block


Patterned brickwork proceeds below DPC level to Classroom block courtyard elevation


Otway floors awaiting foundations for temporary support


Otway fireplaces bricked up- vent detail required.