Friday, 22 January 2010
100121 Site Visit
Classroom block reference panel with joint tests- Raked (top) Bucket handle (middle) Hose (bottom)
Proceed with bucket handle
Motif pattern in contrasting band (formerly glazed brick zone)
Hose joint (lower part)
Imperfections in the Bevern Dark
Corner w/ Dark Brown D (left) and Black D (right) coloured mortars
Proceed with Dark Brown D
Motif detail
Overview
Lightning protection samples- proceed with brown (top) and strike plate (bottom)
Reinforcement to Assembly Hall slab
Reinforcement/ slab prep prior to pour
Slab prep assembly green room/ plantroom
GSHP manifold requires adjustment to cover level for greater soil cover
Opening to Classroom block entrance CL.ED.00.01- right return brickwork with omitted movement joint. All brickwork to return will be supported from footing.
Ditto return to left hand side. Note vertical DPC.
Blockwork proceeds ground floor Classroom block
Patterned brickwork proceeds below DPC level to Classroom block courtyard elevation
Otway floors awaiting foundations for temporary support
Otway fireplaces bricked up- vent detail required.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment