Ibstock Bevern Dark- Some bricks still with damaged faces


Ground floor courtyard elevation of classroom block


DPC detail- projecting 5mm either side


Pattern brickwork underway


DPC bonding issue resolved with insulation


Kingspan insulation installed


Lift shaft block underway


DPC peeling away due to cold weather


Class 1 mortar used to blockwork





Openings formed


Temporary support to Otway ground floor


Flooding continues in Otway basement


Assembly Hall slab completed


trough formed to assembly hall slab