100527 Site Visit
GL L/14 Assembly- penetration required for services
DGT roof panels for Assembly Hall
Brick reference panels
Chimney works to Otway 1fl
2fl Classroom blockwork
Tek acoustic vent- internal grille. Face fixings to be revised to clips
Internal dampers
Blockwork support required below vent
flange detail- will feature compressible strip
Ditto
High level detail to vent- check with internal elevations for position of electrical connection/ gland
Fixing of grille to outside face
Vent in situ
Internal profile- penetration for gland/ cabling into lining?
Assembly minstrel's gallery underway
DGT edge detail discussed- interface with windpost discussed
Otway- fix additional beam into brickwork- HRW to confirm
Downstand beams to teapoint Otway to be removed
Padstone GFl Otway
Damage to underside of existing timbers- will require replacement to match existing