Thursday, 18 March 2010
100318 Site Visit
Assembly Hall block/ landing
Hydra lime pointing sample- for voussoirs- not brickwork
Terracotta installation commenced
Excavation for gas commenced
Inconsistencies to assembly slab
Assembly hall stair installed
Corner feature brickwork now completed GFL classroom block
Movement joint G/L 6/C- clarify position (1/2 brick from return)
Pattern to larger chimney- facing Queens G/L 1- clarify setting out
Lambs bricks on site
Survey of brickwork repair reveals extensive crack to Voussoir Otway G/L F/G 1st floor(noted to Otway mark ups on site)
Chimney brickwork blown
brickwork below cill blown (noted to Otway mark ups on site)
Lambs brick rubbed red specials
Lambs brick rubbed red specials- corner detail