Monday, 12 April 2010

100408 Site Visit


Enterprise arrive to complete gas diversion- Ingrave Road


Gas diversions within site boundary- completes 09/04/10


Wall ties classroom block- not sufficient/ consistent embedment


Poor placement/ embedment of ties- G/L 1, 1st floor- to be rectified


Post fixed tie poorly fitted- G/L 9, 1st floor- to be rectified


Poor placing of ties in blockwork- G/L 1


Ditto


Ditto- all to be rectified


Link slab prep


Containment required for bricklights to G/L 7- FFL


Upstand formed G/L 7


Firrings added- plinth roof assembly hall


Minstrel's Gallery- concrete curing


Service penetrations required to steelwork- G/L K-L high level- as instructed HRW sketch


Assembly precast stair out of square


Precast stair- Hutton to rectify


Classroom beam prep- G/L D


Brickwork to be rebuilt around link steel, G/L C/6- classroom block


Ties to be removed, Classroom block G/L 9/B, GFL