Friday, 30 April 2010
100429 Site Visit
Brickwork overview classroom block
Classroom block brick over CL.ED.00.03 to be cleaned up- spattered with mortar
Mortar missing to facing bricks- GL8 north elevation
Detail for TSI Steels/ link/ classroom block to be forwarded/ instructed
Setting out of 1st floor Otway low wall 1st floor to be updated- survey of stairs out
Rebar to 2nd floor slab
Ditto
Metsec added to east elevation Assembly Hall- nets added
Services penetration required to plinth roof prior to framing up- to be removed
Handrail detail over window to be clarified
Otway basement now half-filled
Otway 1st floor low partition to stair
Rot to valley beam
Preparation for padstone pour 1st floor Otway
Assembly Hall upper reference panel underway
Reference panel face
Reference panel from corner with specials
Discrepancy to course 84- on corner
Discrepancy to bonding courses 76-78 to right elevation B (AS026 rev C2)
Discrepancy between courses 74 and 76 to main elevation A (AS026 rev C2)
brickwork not aligned- special corners unnecessarily cut
Special R4 cut unnecessarily course 78 right elevation(AS026 rev C2)
Classroom overview from Ingrave Road
Assembly Hall overview from Ingrave Road
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment