Friday, 30 April 2010

100429 Site Visit


Brickwork overview classroom block


Classroom block brick over CL.ED.00.03 to be cleaned up- spattered with mortar


Mortar missing to facing bricks- GL8 north elevation


Detail for TSI Steels/ link/ classroom block to be forwarded/ instructed


Setting out of 1st floor Otway low wall 1st floor to be updated- survey of stairs out


Rebar to 2nd floor slab


Ditto


Metsec added to east elevation Assembly Hall- nets added


Services penetration required to plinth roof prior to framing up- to be removed


Handrail detail over window to be clarified


Otway basement now half-filled


Otway 1st floor low partition to stair


Rot to valley beam


Preparation for padstone pour 1st floor Otway


Assembly Hall upper reference panel underway


Reference panel face


Reference panel from corner with specials


Discrepancy to course 84- on corner


Discrepancy to bonding courses 76-78 to right elevation B (AS026 rev C2)


Discrepancy between courses 74 and 76 to main elevation A (AS026 rev C2)
brickwork not aligned- special corners unnecessarily cut


Special R4 cut unnecessarily course 78 right elevation(AS026 rev C2)


Classroom overview from Ingrave Road


Assembly Hall overview from Ingrave Road

No comments:

Post a Comment