Thursday, 23 December 2010

101223 Site Visit


Assembly Hall- plinth scaffold partially struck


Ditto


Hall from ingrave Road


Windows installed w/ glass- GFL Classroom Block


Ditto


Adjacent Queens- shallow window reveals


Fixing detail CL.EW.00.14- head detail to be discussed- lintel higher internally than external


CL link GFL


Thrislington Sentry panels on site


Window to Praes


Insulation required to brickwork 2FL GL D/1


Acoustic seal to head of block to be completed to 1FL toilets- ceilings already installed


CL.01.25- containment interface with edge bead


CL.EW.02.23 head/ ringbeam to be recast


Assembly plenum now constructed behind bleacher seating


Assembly linings


Minor water damage GL 14 GFL- to be replaced once gutters completed


Assembly linings- structure for hanging acoustic reflector


OT windows GFL- OT.ED.00.04- CVA to confirm scope for refurb


Deputy Head 1 Office


Otway step GL H 1FL- 1 No. course brickwork may need to be reduced- CVA to advise


Chimney- slurry applied/ scaffold removed- Otway 1FL


Otway 1FL ceiling


CVA to confirm whether timber can be removed


Timber structure painting underway. CVA to advise on maintaining void over stair GL G-H

No comments:

Post a Comment