Tuesday, 3 May 2011
110426 + 28 Site Visit
Classroom block overview
AS lobby door floor springs
... require alignment
mistakenly fitted with hinges previously- lipping must be replaced.
Slot drain to AS lobby exit doors
AS Plant Room grille treatment required
Green room cill/ wall to be completed
Soft joint required to AS green room
ditto + brick inset and trim off profile
Otway- typical items to wall still requiring removal
Moss requiring removal to Otway walls
Praeposters Court nearing completion- awaiting tile to threshold
Cables/ staples typically requiring removal- Otway
Window profiles sagging in some locations
Brick repairs required high level- CL
Pointing still requires attention CL chimney adjacent Queens
CL canopy carpentry underway- awaiting Bauder roof
Brick lights- installation required
Trickle vents/ grilles omitted in some locations CL
AS stair ply panelling unprotected/ damaged
Otway perimeter fixed benching installed- grille detail
AS soffitt profiles- poorly installed- to be redone
Classroom 11 CL- lighting installed incorrectly
Classroom 11- Acoustic panels installed incorrectly + cover profile omitted
AS bulkhead to hall misaligned- to be redone
Head of Praes court door/ ceiling misaligned
HTP benching on site
Door closer to CL stair 2- clearance to Stair 1 problem when installed
MDF linings to CL windows poorly finished
CL corridor finishes generally- require areas to be made good to perimeter/ around hatches/ light fittings
CL classroom making good generally required around light fittings
CL covers- installation still required classroom 16
Classroom 12- light fitting poorly installed- to be redone
Ditto
Removed trees- stump significant- to be cut done where permitted
AS escape door cover panel poorly installed- to be redone
ditto
Escape door overview
Ingrave Road wall- patching in of marked up bricks
Repointed wall completed