Clearance for balustrade limited to Assembly Hall lobby 1FL


Blockwork to fineline screens AS complete GL 14


HCL/ CVA to liaise regarding support structure for acoustic reflecting panels


MF7 support centres require min. 1200mm centres- steelwork above provides adequate fixings for drops. Classroom 2fl- GL A-B- classrooms- flat areas of ceilings


MF7 support centres require min. 1200mm centres- steelwork above provides adequate fixings for drops. Classroom 2fl- GL B-C corridors- flat areas of ceilings


Bulkhead to be formed to Psychology Classroom for electrical cable containment


CVA to confirm setting out of Classrooms 11 & 16


CVA to confirm triangulated panel- classroom 12 2fl


Awaiting 'I' studs- now instructed to raked areas 2 fl classrooms


Acoustic stopping required high level to blockwork- classroom block


Fireborn cappings underway to assembly hall parapet


Overflow detail to be as classroom block